Sertin

Home › Product › Site documents

Product · Site documents

Every document one site needs, written for the job you won.

Site documents are the site plan in your jurisdiction’s own form plus every task document for that job. Revisions are free while the job is open.

Where and how much

Part of your quote: three projects a year included, more as you run them.

Each project past the first three
$80
a year; CA$110 in Canada · topped up at the same rate if you open more than your quote covers
Included with every paid company
3
projects a year, per company
Regions today
5
the US, Canada, the UK, Australia and New Zealand, each in its own form
How site documents are written

How site documents are written.

01

You describe the site

Tell Sertin the tasks, equipment, hazards and principal contractor. It picks the document your jurisdiction uses and tells you whether the law or your client requires it.

02

Drafting Agent

It writes the site plan and every task document from your existing program set, so the two agree.

03

Repair Agent

If the principal contractor sends it back, paste the note. Revisions are free while the job is open.

By region

By region.

United States

A site-specific safety plan and job hazard analyses for the tasks on that site. OSHA does not require a JHA by standard; this is what the general contractor or site owner requires before you start, and it also records the PPE hazard assessment 29 CFR 1910.132(d) does require.

Canada

The site-specific safety plan, the hazard assessment and the FLHA. In Alberta a written hazard assessment of the work site is required before work begins (OHS Code Part 2 s.7); in other provinces this is what the prime contractor or constructor requires before you are on site.

United Kingdom

The method statement a CDM 2015 principal contractor expects, in British terms. Constructionline Gold asks for two site-specific examples.

Australia

The SWMS, required before any of the 18 listed categories of high-risk construction work starts (WHS Regulations reg 291; Victoria r 327 of its own OHS Regulations). Not every job needs one, and the pack says so.

New Zealand

The site-specific safety plan and a task analysis for each higher-risk task, under the HSWA 2015, which is what a main contractor asks a subcontractor for.

Europe

Site documents are not yet available here. On the continent the statutory site plan is mostly owed by the client’s coordinator and the contractor feeds it; tell us which country you need and that is how the next region gets built.

Questions

Asked before buying.

What are the site documents for a project?

The site plan in your jurisdiction’s own form and every task document for that site, written from the job you describe and from your existing program set. Revisions are free for as long as the job is open.

How is it different from my written programs?

Programs are company-wide: how you work everywhere, which is what Avetta and the other portals want them to be. Site documents are for one site: these tasks, this equipment, this principal contractor, these hazards. Reviewers reject site material in a company program and company material in a site plan; keeping them apart is the point.

How are projects priced?

As part of your quote. Every paid company gets site documents for three projects a year; tell us how many you run and each further one adds $80 a year (CA$110). If you win more work than your quote covers, the extra project is topped up at the same rate. Consultancy clients are at the consultancy rate.

Everything one site needs.

Written from the job you describe and the programs you already have.

14 days free. No payment details to start.