Home › Who it’s for › Australia and New Zealand
The SWMS is written to your state’s own Regulations.
Australia is nine jurisdictions: eight on the model WHS law, and Victoria, written natively to its own Act. New Zealand is a separate system under the HSWA 2015, where a principal asks for a site-specific safety plan instead. Sertin writes each the way its regulator and its principal contractor read it.
What a principal contractor’s SWMS review checks.
The SWMS, to your state’s law
A Safe Work Method Statement for the high-risk construction work you actually do, written to your state or territory’s WHS Regulations. It uses WHS terms: PCBU, the hierarchy of controls, so far as is reasonably practicable. Chemicals run under the GHS; a serious event goes to your regulator as a notifiable incident.
The nine-document WHS set
SWMS, WHS Risk Management, WHS Policy and Responsibilities, Consultation, Cooperation and Coordination, Incident Notification and Investigation, Hazardous Chemicals, Emergency Plan and First Aid, PPE, and Health Monitoring. The set an Australian PCBU hands a principal contractor, or a WHS regulator.
Victoria, on its own Act
Victoria never adopted the model law. A Victorian draft cites the Occupational Health and Safety Act 2004 and the OHS Regulations 2017 and says “employer” rather than PCBU. Written to that Act natively, not converted from a model-law template.
New Zealand is written under the HSWA 2015.
New Zealand documents are framed for a PCBU under the Health and Safety at Work Act 2015. Notifiable events go to WorkSafe NZ. Injury cover runs through ACC, not a workers’ compensation board. A main contractor asks a subcontractor for a site-specific safety plan, backed by a task analysis for each higher-risk task.
Sertin’s New Zealand set leads with those two. The seven documents come underneath, and the set says which are legal duties and which are what your client asks for.
The evidence matches the activities you declare.
Australian and New Zealand prequalification asks for evidence set by your own risk profile: competencies, licences and equipment, and procedures that match the work you said you do. A document for work you do not do is a finding, not a bonus. Sertin drafts from your answers about the work, so the evidence and the declaration agree.
You are charged in US dollars.
Written and kept up to date
from $870/yr
one company · charged in US dollars
The SWMS and the WHS set, or the New Zealand plan and task analyses, written to your jurisdiction, with rejection repair until it passes, and everything kept up to date.
How the quote worksEach project past three
from $80/yr
charged in US dollars
Site documents for the projects you win: three a year are in every quote, and each further one adds its own, revised free for as long as the job is open.
How the quote worksWritten for the principal who reads it.
In Australia you get the SWMS to your state’s Regulations. In New Zealand you get the site-specific safety plan under the HSWA.
14 days free. No payment details to start.