Home › Guides & tools › Program guides › Emergency Action Plan
Emergency Action Plan
The program where generic text shows up fastest. A real plan names your actual sites, exits, and people.
What it is, and why reviewers ask for it
What everyone does when something goes wrong. The plan covers how the alarm sounds and who calls emergency services. It says where people muster and who accounts for the crew. It names who is trained in first aid. In the US the standard is 29 CFR 1910.38. Fire extinguisher requirements sit in 29 CFR 1910.157. In Canada, provinces put emergency preparedness duties in the provincial OHS regulation. Several also require site-specific emergency plans for construction projects.
What a reviewer checks
- Named roles: who sounds the alarm, who calls 911, who takes the head count.
- A muster point that exists at your actual site, not a placeholder.
- First aid coverage: who holds a current certificate and where supplies are.
- How visitors and subcontractors are accounted for.
- Review and drill frequency, with dates.
Why these programs get rejected
The most common finding is placeholder text. Reviewers catch a muster point that was never filled in. They catch a first aid responder with no name. The other frequent finding is missing procedures for anyone who stays behind. Those are the people who shut down critical equipment.
The governing law: US: 29 CFR 1910.38 and 29 CFR 1910.157. Canada: provincial OHS regulation emergency preparedness and first aid sections.
Sertin drafts this program in your details
Sertin drafts this program from plain questions about how your company operates. It arrives formatted for submission and cited to your jurisdiction. If a reviewer rejects it, paste the note. A corrected draft comes back.