Home › Guides & tools › Portal guides › ISNetworld
ISNetworld® and the RAVS® review
The strictest written-program review of the major platforms, and the one where how a section opens decides whether it scores at all.
What the review actually is
ISNetworld collects your questionnaire answers, insurance certificates and injury statistics, and grades you for the hiring clients who subscribe. Sitting inside that is a separate step, the RAVS review, where a human reviewer reads your written safety programs and scores each one against the requirements your client has switched on.
That is the step that costs contractors weeks, and it is the one most template vendors do not write for.
The thing almost nobody is told
In our experience, RAVS reviewers look for language that mirrors each requirement. A reviewer works down a list of required elements, and for each one looks for wording that matches the requirement’s own. Where it is missing, sections are often marked deficient, however good the substance underneath.
In practice that means each required element should open by stating the requirement’s intent and then give the procedure, in that order. Something in the shape of “To ensure that energy sources are isolated before servicing begins, the company shall …”. A program can describe a perfectly run lockout process and still lose the point because it opened with “Our shop takes energy control seriously.”
Two smaller rules follow from the same logic. Use must, shall and will, never should or may: a reviewer reads “should” as optional and an optional control is not a control. And put citations inline, next to the clause each one governs, in a consistent format, rather than collecting them in a references list at the back. A reviewer checking a clause wants the authority on the same line.
Why programs come back
In roughly the order we see them.
A missing or unfindable required section. Often the section exists but is titled something the reviewer is not scanning for, which scores the same as absent.
No specific regulatory citation. “In accordance with OSHA requirements” is not a citation. 29 CFR 1910.147(c)(4), next to the clause it governs, is.
Text that is obviously generic. A document with no job titles, no frequencies and no named locations reads as bought rather than written, and reviewers are good at spotting it.
Training records missing the instructor. The record needs the company name, the date, the course and topics, the trainee names and signatures, and the instructor’s name and signature. The instructor half is the one usually left off.
Placeholders. A live [COMPANY NAME] is an instant return, and it happens more often than anyone admits.
Rejections arrive as a deficiency notice naming what failed. Fix exactly what it names, resubmit, and do not rewrite the parts it did not mention. The rejection-repair walkthrough shows a real notice and the fifteen-minute fix, and the free rejection-notice decoder will translate yours.
Outside the United States
ISNetworld operates in Canada, and a Canadian submission is not a US one with the spelling changed. Programs must cite your province’s act and regulation, hazard communication is WHMIS 2015 rather than OSHA HazCom, and injury records follow your workers’ compensation board rather than an OSHA 300 log. ISN also verifies COR and SECOR status on Canadian accounts. The Canada guide covers all of it.
In Europe the picture is different again: the pre-approval portals are not how European contractor vetting mostly works, so what matters there is the document your labor inspectorate expects. See Europe and the UK.
The other platforms
Read about Avetta or Veriforce. Or read the pattern all of them share.
Have the programs drafted instead
Sertin writes each program in your own details, cited to the law where you work, formatted for the platform that will read it, and repairs the ones a reviewer sends back from their own note. Fourteen days free, no payment details to start.